EPDP Fujian 2 x PP 600 kty

Client:  LyondellBasell

Enduser:  Fujian Zhongjjing  

Location:  China

Description:

PDP and Extended PDP (BASIC) of the bigger capacity Spheripol Plant ever designed by LyondellBasell.

Duration:

Start: September 2018

End: July 2019

fujian

Disciplines involved:

  • Civil
  • Mechanical
  • Steel structures
  • Site assistant
  • Process
  • Piping Layout

Scope of work:

  • General Specification
  • Customized process Packege
  • Equipment data sheet
  • MR for Long Lead Item
  • Equipment Layout
  • Foundation
  • Underground Layout
  • Piping Study
  • 3D model